Skip to content
Laminate flooring example

Flooring quote template for uplift, subfloor preparation, laminate and trims

The finished flooring is only one part of the job. This example keeps uplift, subfloor preparation, underlay, installation and trims separate so the customer can see where condition-related costs come from.

Example job

What this example assumes

Replacement of existing floating flooring through selected living areas with new laminate, including normal uplift and minor subfloor preparation.

Why the quote is structured this way

Measured installation quantities stay separate from uncertain subfloor remediation. That avoids underpricing invisible preparation while still giving the customer a clear base price for the chosen floor system.

Scope of work

Customer-facing scope written in job order

Use this as a structural example, then rewrite the wording around the actual property, condition, selections and exclusions.

01

Uplift and dispose of existing floor covering

Remove the nominated existing floor finish and normal associated waste from the quoted areas.

02

Inspect and complete included minor subfloor preparation

Check the exposed substrate and complete the normal patching or levelling allowance stated in the quote.

03

Install specified underlay or moisture layer

Fit the agreed underlay or barrier required for the selected system and substrate.

04

Install laminate flooring to agreed areas

Lay the selected flooring to the measured rooms with normal cuts, joins and expansion requirements.

05

Fit scotia, thresholds and listed trims

Install the finishing trims included in the quote and leave transitions neat.

Quote items

Separate the price lines customers may need to understand or change

These are pricing structures, not market rates. Your business sets its own costs, rates, margins and quantities.

Quote itemTypical unitPricing note
Uplift and disposalDifferent existing floor types can require different removal allowances.
Subfloor preparation allowancem² / fixed priceState what “minor” preparation includes and how larger levelling is approved.
UnderlaySpecify the product class or allowance.
Laminate supply and installationSeparate product allowance from installation if customer selections may change.
Scotia, thresholds and trimslinear metre / itemIdentify trims that are excluded or reused.
Assumptions to confirm

State what the price relies on

  • Measured rooms are clear enough for installation as agreed.
  • Subfloor moisture and level are within the stated preparation allowance.
  • Customer confirms final flooring selection before ordering.
Common exclusions

Name the boundary before the job starts

  • Major subfloor levelling, structural repair or moisture remediation.
  • Furniture moving unless specifically included.
  • Door trimming, skirting replacement or painting unless listed.
Before sending

Questions worth resolving in the quote

The best template is not the one with the most words. It is the one that prompts you to settle the few details most likely to cause a pricing or expectation gap.

Q1

What level of subfloor preparation is included?

Q2

Is furniture moving part of the price?

Q3

Are trims and thresholds new or reused?

Q4

How is extra levelling handled if the floor is worse than expected?

Keep measured flooring work separate from condition-driven preparation

Save repeatable scope and quote-item wording inside Tradient, adapt it to the job in front of you, then send one clear quote for questions, acceptance and signature.