Skip to content
Interior repaint example

Interior repaint quote template with prep, primer and two-coat scope made explicit

A useful interior repaint quote should show the customer what happens before the colour goes on. This example separates protection, surface preparation, repairs, primer, finish coats and cleanup so the price is easier to understand and the scope is easier to defend.

Example job

What this example assumes

Three-bedroom occupied home with living areas, hallway and selected bedrooms being repainted. Existing acrylic coatings are generally sound, with normal dents, hairline cracking and isolated bare patches from previous repairs.

Why the quote is structured this way

The scope is written in the same order the painter would normally approach the job: protect, prepare, repair, prime where needed, coat the agreed surfaces, then clean down. That keeps expensive preparation from disappearing behind a vague “paint interior” line.

Scope of work

Customer-facing scope written in job order

Use this as a structural example, then rewrite the wording around the actual property, condition, selections and exclusions.

01

Protect floors, furniture and adjacent finishes

Cover flooring, move or protect accessible furniture, mask fittings and shield surfaces not included in the painting work.

02

Wash, scrape and prepare specified surfaces

Remove loose material, clean contamination that may affect adhesion and prepare the agreed walls, ceilings and trims for repairs and coating.

03

Fill minor dents, nail holes and hairline cracks

Complete normal minor filling included in the repaint allowance, then sand repaired areas smooth and dust down.

04

Spot-prime bare and repaired areas

Prime exposed substrate, filler and other localised areas where a sealing or adhesion coat is required before finish coats.

05

Apply two finish coats to agreed wall surfaces

Apply two full finish coats to nominated interior walls using the agreed sheen and colour schedule, including normal cut-in work.

06

Prepare and paint selected ceilings and trims

Coat only the ceilings, doors, frames, skirtings and architraves specifically included in the accepted quote.

07

Remove masking, tidy and remove trade waste

Remove normal protection materials and leave the work areas tidy on completion.

Quote items

Separate the price lines customers may need to understand or change

These are pricing structures, not market rates. Your business sets its own costs, rates, margins and quantities.

Quote itemTypical unitPricing note
Interior wall preparationm² or roomMeasure the actual surface area or use a room allowance that reflects condition.
Interior wall painting, two finish coatsSeparate from preparation when prep varies significantly between rooms.
Ceiling preparation and paintingKeep ceilings separate because access, staining and texture can change labour.
Doors, frames, skirtings and trimsitem / linear metreItemise joinery so customers can add or remove areas without repricing the entire job.
Paint and sundry materialsfixed priceState whether premium products, stain blockers or specialist primers are included.
Assumptions to confirm

State what the price relies on

  • Normal residential access during agreed working hours.
  • Colours and sheen levels are confirmed before ordering finish paint.
  • Existing coatings are suitable to receive the specified system after normal preparation.
Common exclusions

Name the boundary before the job starts

  • Major plaster repairs, water-damage remediation or substrate replacement.
  • Lead-paint or asbestos-related work unless separately assessed and quoted.
  • Moving unusually heavy furniture or removing fixed window coverings unless specifically included.
Before sending

Questions worth resolving in the quote

The best template is not the one with the most words. It is the one that prompts you to settle the few details most likely to cause a pricing or expectation gap.

Q1

Are ceilings, doors and trims included or walls only?

Q2

How many finish coats are included?

Q3

What level of crack and plaster repair is included before painting?

Q4

Who supplies the final colour schedule and when does it need to be confirmed?

Turn this repaint structure into your own reusable painting template

Save repeatable scope and quote-item wording inside Tradient, adapt it to the job in front of you, then send one clear quote for questions, acceptance and signature.