Deck rebuild quote template that separates demolition, framing, decking and handover
Deck work can hide expensive unknowns below the boards. A clearer quote separates removal, structural framing, decking, balustrades and disposal, while stating what happens if concealed damage is found after demolition.
Example job
What this example assumes
Replacement of an ageing timber deck attached to an existing dwelling. The visible decking is deteriorated and sections of framing may require replacement once exposed.
Why the quote is structured this way
The customer-facing quote should distinguish known work from concealed-condition risk. That makes the base scope comparable while creating a clear process for additional structural repairs discovered after strip-out.
Customer-facing scope written in job order
Use this as a structural example, then rewrite the wording around the actual property, condition, selections and exclusions.
Establish access and protect adjacent areas
Set up safe access, protect nearby cladding and landscaping, and define the work zone before demolition.
Remove existing decking and agreed structural components
Demolish the nominated deck elements carefully and sort reusable, recyclable and waste materials.
Inspect exposed framing and confirm repair allowance
Check joists, bearers and fixings after strip-out and record any work outside the agreed visible-condition allowance before proceeding.
Repair or replace framing included in the quote
Install the specified structural timber and fixings to the agreed design and applicable requirements.
Install new decking and edge details
Lay decking with appropriate spacing, fixings, cuts and perimeter finishing to the agreed layout.
Install included stairs, handrails or balustrades
Complete only the access and safety elements listed in the accepted scope.
Remove construction waste and complete handover
Clear offcuts and debris and walk the completed work with the customer.
Separate the price lines customers may need to understand or change
These are pricing structures, not market rates. Your business sets its own costs, rates, margins and quantities.
| Quote item | Typical unit | Pricing note |
|---|---|---|
| Demolition and strip-out labour | day / fixed price | Keep demolition visible so disposal and access complexity are not hidden in carpentry labour. |
| Structural timber and framing labour | fixed price | Base the allowance on visible conditions and clearly state how concealed damage is handled. |
| Decking supply and installation | m² | Specify the decking product or an allowance so material upgrades can be priced transparently. |
| Balustrades, stairs and finishing carpentry | item / linear metre | Separate optional or design-sensitive components. |
| Skip, haulage and disposal | item | State disposal assumptions, especially for difficult access. |
State what the price relies on
- Existing foundations and concealed structure are serviceable except for the stated repair allowance.
- Customer selections are made before material ordering.
- Consent, engineering or design work is included only when expressly listed.
Name the boundary before the job starts
- Unforeseen structural remediation beyond the stated allowance.
- Electrical, plumbing or drainage relocation unless listed.
- Painting or staining unless included as a separate scope item.
Questions worth resolving in the quote
The best template is not the one with the most words. It is the one that prompts you to settle the few details most likely to cause a pricing or expectation gap.
What happens if rotten framing is found after the deck is opened up?
Is consent or engineering required and who is responsible for it?
Which decking product and fixing system are included?
Are stairs, balustrades and finishing coats included?
Use the example as one part of the quoting system